Click to Zoom

82439001

Description
Rufnek planetary winches are the defacto standard for heavy haul and rail car spotting applications. This complete line of winches comprises six different winches with line pulls from 30,000 lbs. (133.4 kN) to over 130,000 lbs. (578.2 kN). We have you covered for every application that demands a no-nonsense, rugged winch.

Features
  • Easy access sliding drum clutch
  • Freespool drum clutch with band brake
  • Multiple single speed and 2-speed motor configuations available.
  • Easy access grease zerks
  • Synthetic Gear Oil & Grease
  • Electronic Clutch Position Indicator
  • Intelliguard Capacity Alert & Datalogging System
SKU
Product Name
82439001
RN65P-HRXOA2
USD $23,664.25
24 Weeks
Bill Of Material
43152
MTR - HYD - GR - 03.2 - D - C4
USD $3,625.45
13 Weeks
Required Qty Per Unit: 1
43419
COVER, BRAKE, 4B-C
USD $654.35
6 Weeks
Required Qty Per Unit: 1
KIT-BOLT-RN 65
USD $161.26
6 Weeks
Required Qty Per Unit: 1
42494
HOSE #4-R2 X 10.50" - #4 FJIC/ #4 FJIC90°
USD $93.63
2 Weeks
Required Qty Per Unit: 1
42942
PISTON, BRAKE
USD $1,362.79
7 Weeks
Required Qty Per Unit: 1
33094
O-Ring - 260 - 06.48 - 00.139
Contact Sales
Required Qty Per Unit: 1
42230
Spring-Compression - 00.75 x 01.25 x 0385 lb/in
USD $5.20
5 Weeks
Required Qty Per Unit: 12
32186
O-Ring - 362 - 06.22 - 00.210
USD $2.08
4 Weeks
Required Qty Per Unit: 1
42337
Backup Ring - 362 - 06.27 - 00.076
USD $8.32
4 Weeks
Required Qty Per Unit: 1
42335
O-Ring - 358 - 05.60 - 00.210
USD $2.08
4 Weeks
Required Qty Per Unit: 1
42336
Backup Ring - 358 - 05.65 - 00.076
USD $6.24
4 Weeks
Required Qty Per Unit: 1
42148
PLATE, STATOR
USD $8.32
11 Weeks
Required Qty Per Unit: 7
32765
DISC, FRICTION
USD $39.53
9 Weeks
Required Qty Per Unit: 6
DRIVER, BRAKE, RN60P-RN130P
USD $404.20
7 Weeks
Required Qty Per Unit: 1
81434
BEARING - RA - BAL - 01.772
USD $67.62
8 Weeks
Required Qty Per Unit: 2
HOUSING, BEARING, RN60P
USD $404.20
8 Weeks
Required Qty Per Unit: 1
44323
Ring-Retaining - Spiral - 01.771
USD $2.08
4 Weeks
Required Qty Per Unit: 2
41759
CLUTCH, SPRAG
USD $752.14
2 Weeks
Required Qty Per Unit: 1
DRIVER, INPUT, RN60P
USD $2,039.09
6 Weeks
Required Qty Per Unit: 1
43033
BUSHING, RN60P
USD $213.24
4 Weeks
Required Qty Per Unit: 2
44325
Ring-Retaining - Spiral - 01.375
USD $2.08
4 Weeks
Required Qty Per Unit: 1
COLLAR, THRUST, RN60P
USD $967.54
8 Weeks
Required Qty Per Unit: 1
44689
Seal - DL - 03.75 - 00.437
USD $44.73
6 Weeks
Required Qty Per Unit: 2
CLUTCH, SLIDING, RN60P
USD $1,888.40
2 Weeks
Required Qty Per Unit: 1
CLUTCH, DRUM, RN60P
USD $1,139.41
8 Weeks
Required Qty Per Unit: 1
COUPLER, RN60
USD $2,382.78
6 Weeks
Required Qty Per Unit: 1
43032
BUSHING, RN60P
USD $237.64
4 Weeks
Required Qty Per Unit: 2
45730
TUBE, GREASE, RN60P
Contact Sales
Required Qty Per Unit: 1
DRUM, RN60P
USD $6,954.20
8 Weeks
Required Qty Per Unit: 1
31543
O-Ring - 232 - 02.73 - 00.139
USD $2.08
4 Weeks
Required Qty Per Unit: 1
43066
WASHER, THRUST, RN60P
USD $273.71
6 Weeks
Required Qty Per Unit: 1
42976
SHAFT, OUTPUT, RN60P
USD $2,496.30
6 Weeks
Required Qty Per Unit: 1
KIT, INTELLIGUARD II, RN60P
Contact Sales
Required Qty Per Unit: 1
GEAR SET, OUTPUT, RN60
USD $2,894.14
4 Weeks
Required Qty Per Unit: 1
GEAR SET, SECONDARY, RN60
USD $3,260.15
4 Weeks
Required Qty Per Unit: 1
GEAR SET, INPUT, RN60
USD $3,486.12
4 Weeks
Required Qty Per Unit: 1
41722
Thrust Washer - 3.750
USD $28.09
8 Weeks
Required Qty Per Unit: 2
42999
SUN GEAR, SECONDARY, RN60P
USD $288.56
3 Weeks
Required Qty Per Unit: 1
42996
SUN GEAR, OUTPUT, RN60P
USD $182.47
6 Weeks
Required Qty Per Unit: 1
GEAR, SUN, RN60P
USD $1,849.13
2 Weeks
Required Qty Per Unit: 1
43828
CLEVIS
USD $72.82
10 Weeks
Required Qty Per Unit: 1
43827
PIN, CLEVIS
USD $39.53
6 Weeks
Required Qty Per Unit: 2
41247
FITTING, GREASE ZERK, 90 DEG.
USD $2.08
7 Weeks
Required Qty Per Unit: 2
44324
BEARING - RA - NRB - 01.125
USD $13.52
7 Weeks
Required Qty Per Unit: 1
THRUST COLLAR, RN60P
USD $1,366.61
6 Weeks
Required Qty Per Unit: 1
43459
HOSE #4-R2 X 22.50" - #4 FJIC/ #4 FJIC90°
USD $63.46
2 Weeks
Required Qty Per Unit: 1
COVER, RN60P
USD $754.30
8 Weeks
Required Qty Per Unit: 1
42495
HOSE #4-R2 X 15.50" - #4 FJIC/ #4 FJIC45°
USD $121.72
4 Weeks
Required Qty Per Unit: 1
43120
O-Ring - 369 - 07.97 - 00.210
USD $3.12
4 Weeks
Required Qty Per Unit: 1
HOUSING, GEAR, PRIMARY, RN60P
USD $2,636.34
8 Weeks
Required Qty Per Unit: 1
42841
O-Ring - 382 - 12.97 - 00.210
USD $8.32
4 Weeks
Required Qty Per Unit: 1
HOUSING, GEAR, RN60P
USD $10,487.00
8 Weeks
Required Qty Per Unit: 1
4238
BRAKE BAND ASSY., RN60
USD $1,290.05
6 Weeks
Required Qty Per Unit: 1
YOKE ASSEMBLY-RN45-100
USD $982.39
8 Weeks
Required Qty Per Unit: 1
42929
CYLINDER, AIR, BRAKE BAND, RN
USD $880.55
8 Weeks
Required Qty Per Unit: 1
42955
MOUNTING, BRACKET, AIR CYLINDER
USD $36.41
6 Weeks
Required Qty Per Unit: 1
PLUG, ADAPTER, SAE #12 - 1/8 NPSF
USD $144.60
2 Weeks
Required Qty Per Unit: 1
13050-TW
BREATHER
USD $6.24
8 Weeks
Required Qty Per Unit: 1
BLOCK, COUNTERBALANCE, 1.25" CODE 61
USD $455.65
2 Weeks
Required Qty Per Unit: 1
42031
HOSE #4-R2 X 18.00" - #4 FJIC/ #4 FJIC90°
USD $101.95
2 Weeks
Required Qty Per Unit: 1
42438
FITTING, TEE, BRANCH
USD $28.09
6 Weeks
Required Qty Per Unit: 2
40280
ADAPTER, STRAIGHT
USD $9.36
6 Weeks
Required Qty Per Unit: 1
42030
HOSE #4-R2 X 14.00" #4 FJIC/ #4 FJIC
USD $63.46
2 Weeks
Required Qty Per Unit: 1
41838
ADAPTER, STRAIGHT
USD $2.08
6 Weeks
Required Qty Per Unit: 2
44603
CAP, ALUMINUM, THREADED
USD $2.08
5 Weeks
Required Qty Per Unit: 1
43834
T&F KIT, AIR SHIFT RN45P, RN60P, RN80P
USD $112.46
10 Weeks
Required Qty Per Unit: 1
31582
PLUG, O-RING
USD $6.24
4 Weeks
Required Qty Per Unit: 1
41719
PLUG, O-RING
USD $3.12
7 Weeks
Required Qty Per Unit: 1
42033
TEE, SWIVEL
USD $11.44
10 Weeks
Required Qty Per Unit: 1
32411
PLUG, HEX, ORING, #16
USD $19.77
6 Weeks
Required Qty Per Unit: 1
43877
BRACKET, RN45-100P
USD $236.58
6 Weeks
Required Qty Per Unit: 1
43891
COVER, AIR CYLINDER
USD $11.44
8 Weeks
Required Qty Per Unit: 1
42089
ADAPTER, 90 DEGREE
USD $11.44
2 Weeks
Required Qty Per Unit: 3
BLOCK, MANIFOLD
USD $301.69
5 Weeks
Required Qty Per Unit: 1
43070
KEY
USD $28.09
6 Weeks
Required Qty Per Unit: 3
42987
LABEL, DRUM BRAKE
USD $3.12
4 Weeks
Required Qty Per Unit: 1
42985
LABEL, CLUTCH IN
USD $21.85
5 Weeks
Required Qty Per Unit: 1
43078
SPACER
USD $4.16
6 Weeks
Required Qty Per Unit: 4
9620
O-Ring - 159 - 04.98 - 00.103
USD $2.08
4 Weeks
Required Qty Per Unit: 1
43367
VALVE, CARTRIDGE, 12V
USD $568.00
2 Weeks
Required Qty Per Unit: 1
45012
HOLLOW LOCK SOCKET
USD $3.12
3 Weeks
Required Qty Per Unit: 2
3809
CAPLUG-PLASTIC-HH-SAE #16 (1-5/16-12UN) W/O RING
USD $3.12
7 Weeks
Required Qty Per Unit: 2
42986
LABEL, CLUTCH OUT
USD $6.24
6 Weeks
Required Qty Per Unit: 1
44340
CYLINDER, AIR
USD $669.95
9 Weeks
Required Qty Per Unit: 1
32182
O-Ring - 222 - 01.48 - 00.139
USD $2.08
4 Weeks
Required Qty Per Unit: 2
41867
VALVE, COUNTERBALANCE, CBGA-LAN
USD $618.98
2 Weeks
Required Qty Per Unit: 1
44756
PLATE, LOGO, INTELLIGUARD
USD $41.61
6 Weeks
Required Qty Per Unit: 1
43931
TAG, RUFNEK
USD $4.16
6 Weeks
Required Qty Per Unit: 1
994188
Thrust Washer - 1.000
USD $2.08
12 Weeks
Required Qty Per Unit: 3
34029
CAPLUG
USD $2.08
5 Weeks
Required Qty Per Unit: 3