Click to Zoom

115-00041-2

Description
Gear Products hoists are high-efficiency products serving the energy, mining, and infrastructure markets. With line-pull ratings from 12,000 Lbs.. (53.4 kN) to 15,000 Lbs.. (66.7 kN), the gear products hoist is your trusted source for robust, reliable hoists.

Features
  • Custom and Standard Sideplate Designs
  • High Static Brake Capacity (Accommodates up to 200 PSI backpressure)
  • Numerous Hydraulic Motor Options
  • Various Ratio's Available
  • Multiple Drum Options Available
  • Cable Packer/Roller Options Available
  • Integrated Electronic Drum Rotation, Speed, Direction and Layer Indication Available
SKU
Product Name
115-00041-2
WINCH ASS'Y PLANETARY
Contact Sales
Bill Of Material
008-10056-1
Gasket - 6B - 02.75 - 00.031
USD $2.08
4 Weeks
Required Qty Per Unit: 1
015-10047-1
Spring-Compression - 00.18 x 01.00 x 0033 lb/in
USD $2.08
9 Weeks
Required Qty Per Unit: 4
015-10048-1
PLUNGER
USD $4.16
5 Weeks
Required Qty Per Unit: 4
015-10049-1
RING,RETAINER
USD $83.22
6 Weeks
Required Qty Per Unit: 1
015-10444-1
DRIVE SCREW
USD $2.08
3 Weeks
Required Qty Per Unit: 2
CYLINDER, BRAKE
USD $4,941.43
6 Weeks
Required Qty Per Unit: 1
PISTON, BRAKE
USD $547.20
8 Weeks
Required Qty Per Unit: 1
110-10003-2
PLATE, SPRING
USD $31.21
6 Weeks
Required Qty Per Unit: 1
110-10004-2
DISC, FIBER BRAKE Alto 027712A (K2/4574)
USD $5.20
10 Weeks
Required Qty Per Unit: 8
110-10005-2
DISC, STEEL BRAKE
USD $2.08
10 Weeks
Required Qty Per Unit: 8
110-10007-1
Spring-Compression - 00.50 x 01.79 x 0224 lb/in
USD $2.08
5 Weeks
Required Qty Per Unit: 16
110-10008-1
PLATE, BACK-UP, 3/8 THK
USD $134.20
6 Weeks
Required Qty Per Unit: 1
110-10009-2
RACE, BRAKE
USD $862.41
7 Weeks
Required Qty Per Unit: 1
110-10011-1
ROLLER
USD $4.16
7 Weeks
Required Qty Per Unit: 4
CARRIER-ASSY-PRI-6:1-6/8P
USD $2,975.26
3 Weeks
Required Qty Per Unit: 1
CARRIER-ASSY-SEC-6:1-6/8P
USD $2,871.23
3 Weeks
Required Qty Per Unit: 1
SUPPORT, DRUM
USD $1,754.99
8 Weeks
Required Qty Per Unit: 1
110-10021-1
SPACER
USD $88.43
10 Weeks
Required Qty Per Unit: 1
110-10025-1
BUSHING, CABLE DRUM
USD $459.81
14 Weeks
Required Qty Per Unit: 1
110-10039-1
BAR, TIE
USD $104.03
7 Weeks
Required Qty Per Unit: 1
GEAR, RING
USD $7,133.34
6 Weeks
Required Qty Per Unit: 1
GEAR, INPUT 6/8P, LH
USD $1,989.05
6 Weeks
Required Qty Per Unit: 1
110-10077-1
CLAMP, CABLE
Contact Sales
Required Qty Per Unit: 1
110-10082-1
SHIM
USD $6.24
26 Weeks
Required Qty Per Unit: 1
110-10085-1
Capscrew-Hex - 0.50-13 x 01.50 - BOLT PER DRAWING
USD $3.12
3 Weeks
Required Qty Per Unit: 22
BASE (17.75)
USD $334.98
8 Weeks
Required Qty Per Unit: 1
110-10142-1
ADPT,90,1/4FPT X 4MJIC
USD $6.24
8 Weeks
Required Qty Per Unit: 1
DRUM, CABLE
USD $3,995.79
8 Weeks
Required Qty Per Unit: 1
110-10248-1
PLATE, SIDE
Contact Sales
Required Qty Per Unit: 2
502-10020-1
BEARING - RA - NRB - 01.750
USD $39.53
15 Weeks
Required Qty Per Unit: 1
502-10025-1
BEARING - RA - NRB - 02.250
USD $68.66
15 Weeks
Required Qty Per Unit: 1
520-10183-1
Seal - SL - 05.00 - 00.562
USD $35.37
4 Weeks
Required Qty Per Unit: 1
9570
Seal - DL - 07.25 - 00.625
Contact Sales
Required Qty Per Unit: 1
525-10108-1
Ring-Retaining - Standard - 02.250
USD $2.08
6 Weeks
Required Qty Per Unit: 2
525-10115-1
Ring-Retaining - Standard - 06.250
USD $74.90
4 Weeks
Required Qty Per Unit: 1
530-10036-1
O-Ring - 242 - 03.98 - 00.139
USD $2.08
4 Weeks
Required Qty Per Unit: 1
530-10049-1
O-Ring - 268 - 08.48 - 00.139
USD $2.08
4 Weeks
Required Qty Per Unit: 1
530-10089-1
O-Ring - 432 - 05.35 - 00.275
USD $2.08
7 Weeks
Required Qty Per Unit: 1
530-10091-1
O-Ring - 437 - 05.97 - 00.275
USD $2.08
4 Weeks
Required Qty Per Unit: 1
531-10089-1
Backup Ring - 432 - 05.42 - 00.117
USD $2.08
4 Weeks
Required Qty Per Unit: 1
531-10091-1
Backup Ring - 437 - 06.05 - 00.117
USD $3.12
4 Weeks
Required Qty Per Unit: 1
535-10037-1
PLUG, 1/8 NPT, SKT HD
USD $2.08
3 Weeks
Required Qty Per Unit: 2
535-10040-1
PLUG, 1/2 NPT
USD $2.08
6 Weeks
Required Qty Per Unit: 1
110-10140-1
NIPPLE, 1/4NPT X 2-3/4
USD $14.56
4 Weeks
Required Qty Per Unit: 1
802-10083-1
Capscrew-Hex - 0.50-20 x 01.25
USD $2.08
3 Weeks
Required Qty Per Unit: 16
20266
Capscrew-Hex - 0.50-20 x 02.25
USD $2.08
3 Weeks
Required Qty Per Unit: 2
1402
Capscrew-Hex - 0.50-13 x 01.25
USD $2.08
3 Weeks
Required Qty Per Unit: 4
823-10035-1
Capscrew-Socket - 0.38-16 x 01.00
USD $2.08
3 Weeks
Required Qty Per Unit: 3
892-10006-1
Washer-Flat - 0.50
USD $2.08
3 Weeks
Required Qty Per Unit: 2
1495
Washer-Lock - 0.50
USD $2.08
3 Weeks
Required Qty Per Unit: 42
410-10142-1
MTR - HYD - GE - 14.5 - S - A4
USD $936.27
2 Weeks
Required Qty Per Unit: 1
110-10364-1
VALVE,C'BAL SUN # A705-219-B04
USD $1,196.35
18 Weeks
Required Qty Per Unit: 1
803-10037-1
Capscrew-Hex - 0.31-18 x 02.75
USD $2.08
3 Weeks
Required Qty Per Unit: 4
897-10003-1
Washer-Lock - 0.31
USD $2.08
3 Weeks
Required Qty Per Unit: 4
114-10002-1
HOSE #4-R1 X 14.00" - #4 FJIC/ #4 FJIC
USD $40.57
2 Weeks
Required Qty Per Unit: 1
220-10058-1
ADPT,STR,#4MSAE X #4MJIC
USD $4.16
4 Weeks
Required Qty Per Unit: 1
110-10108-1
ADPT,90,#4FJIC X #4MJIC
USD $2.08
7 Weeks
Required Qty Per Unit: 1
115-10051-1
SHIM,3/4 DIA X .032 THK
USD $3.12
9 Weeks
Required Qty Per Unit: 1
115-10052-1
SHIM,3/4 DIA X .074 THK
USD $2.08
5 Weeks
Required Qty Per Unit: 1
535-10035-1
VENT, 1/8 NPT, 1-5PSI
USD $2.08
3 Weeks
Required Qty Per Unit: 1
600-150597-1
LABEL PLATE, 2 7/8 X 2
Contact Sales
Required Qty Per Unit: 1
32058
CAPLUG-PLASTIC-HH-SAE #12
USD $2.08
3 Weeks
Required Qty Per Unit: 2
115-10053-1
SHIM,3/4 DIA X .134 THK
USD $11.44
4 Weeks
Required Qty Per Unit: 1